![background image](http://html1.mh-extra.com/html/omron/cj2h-cpu6-rev-02-2010/cj2h-cpu6-rev-02-2010_operation-manual_740798232.webp)
206
FINS/TCP Method
Section 8-3
• When routing tables are used for one or more other nodes on the same
network
It is not necessary to set routing tables if one Communications Unit is
mounted to the PLC and the nodes are connected as one network.
(2) If EtherNet/IP is selected for CX-Programmer communications, FINS
message communications and remote programming/monitoring from the
CX-Programmer will be possible as long as CIP routing is possible for the
entire communications path. Routing tables do not need to be set. If FINS
messages are sent from a PLC, however, then routing tables must be set.
Summary of Contents for CJ2H-CPU6 - REV 02-2010
Page 2: ......
Page 4: ...iv...
Page 6: ...vi...
Page 14: ...xiv...
Page 18: ...xviii...
Page 38: ...12 Network Configurator Overview Section 1 5...
Page 58: ...32 Selecting the Network Devices Section 2 3...
Page 116: ...90 Auxiliary Area Data Section 4 5...
Page 222: ...196 Message Communications Errors Section 7 6...
Page 364: ...338 Using the Backup Tool Section 13 3...
Page 402: ...376 CS CJ series Ethernet Unit Function Comparison Appendix A...
Page 404: ...378 Ethernet Network Parameters Appendix B...
Page 406: ...380 TCP Status Transitions Appendix C...
Page 452: ...426 Precautions for Using Windows XP Vista or Windows 7 Appendix G...
Page 460: ...434 Index...
Page 462: ...436 Revision History...
Page 463: ......