Installing  the  unit  in  the  following  places  may  cause  it  to 
malfunction (please enquire if it is unavoidable):

Places  that  contain  mineral  oil  such  as  machine  oil  for 
cutting.

Places with high salt content in the air such as the sea.

Areas  like  hot  springs  where  there  are  corrosive  gases  like 
sulphur gases.

Factories  with  major  voltage  fluctuations  in  the  power 
supplies.

Places like a car or cabin room.

Areas filled with cooking oil and gas like kitchens.

Places where strong electromagnetic waves are present.

Places where flammable gases or materials are present.

Areas where there is evaporation of acid or alkaline gases.

Other special environmental conditions.

CAUTION

Choose the correct move-in path.

Carry the device in its original package.

Electrical  insulation  measures  can  be  taken  in  accordance 
with relevant technical specifications of electrical equipment if 
the air conditioner is to  be  installed onto the  metal part  of  a 
building. 

If  the  height  difference  is  greater  than  the  allowed  level 
difference,  it  is  recommended  to  place  the  ODU  above  the 
IDU.

CAUTION

The  IDU  should  be  handled  with  care,  and  it  should  not  be 
subjected to heavy pressure.

After  the  IDU  is  installed,  in  case  of  construction,  the  IDU 
should be protected to prevent garbage and dust from falling 
into the unit.

The fan should be rotated before the test run. Make sure that 
there is no abnormal friction before powering on the unit.

CAUTION

Install the air conditioner in a location with sufficient strength 
to  support  the  weight  of  the  unit.  Take  reinforcement 
measures when necessary.

The unit may fall and cause personal injury if the location is 
not strong enough.

Carry  out  the  specified  installation  works  to  prevent  strong 
winds or earthquakes.

Improper  installation  may  cause  the  unit  to  drop  leading  to 
accidents.

Before wiring/pipe layout, make sure that the installation area 
(walls  and  floor)  is  safe  and  free  of  water,  power,  gas,  and 
other hidden dangers.

WARMING

Enough space for installation and maintenance.
The ceiling is level, and the structure is strong enough to support
the  weight  of  IDU;  take  reinforcement  measures  when
necessary.
Airflow in/out of the machine is not obstructed, and the external

air exerts minimum impact.
Easy to supply airflow to every corner in the room.
Easy  to  drain  fluids  from  the  connected  piping  and  water

discharge piping.
No direct heat radiation.
Avoid  installation  in  narrow  spaces  or  where  there  are  more

stringent noise require-ments.

Enough space for installation and maintenance.
Unobstructed airflow in/out of the unit; no strong breeze.
The site should be dry and well-ventilated.
The  supporting  surface  should  be  flat  and  able  to  bear  the

weight  of  the  unit.  The  ODU  should  be  able  to  be  installed
horizontally  without  increasing  vibration  and  noise.  Take

reinforcement measures when necessary.
The  operating  noise  and  the  discharged  air  should  not  affect

neighbours.
There should be no leakage of flammable gas nearby.
It  should  be  easy  to  install  the  connecting  pipes  and  complete

electrical connections.
The  level  difference  of  connection  pipes  and  the  lengths  of
connection pipes must be within the allowed ranges.

3.1 Choosing an Installation Site

3.2 IDU Installation

3. INSTALLATION

A

H

Connet to the outlet 
of drain pipe

Connective port of 
   refrigerant pipe

(Air side)

(Liquid side)

Connective port 
of refrigerant pipe

Floor

Ceiling

Panel

Air outlet

Air inlet

Air outlet

  910mm (Ceiling hole)

Summary of Contents for OTEC IECS-D Series

Page 1: ......

Page 2: ...sconnection device which has at least 3mm separation distance in all pole and a residual current device RCD with the rating of above 10mA shall be incorporated in the fixed wiring according to the nat...

Page 3: ...requirement 18 Vacuum pump Charge hose R410A special requirement 19 Torque wrench 20 Copper pipe gauge adjusting projection margin 21 Vacuum pump adapter Required tools for installation work 1 Philip...

Page 4: ...ry if the location is not strong enough Carry out the specified installation works to prevent strong winds or earthquakes Improper installation may cause the unit to drop leading to accidents Before w...

Page 5: ...ling when necessary b Adjust the position of the unit and make sure that the gap with the ceiling is evenly spaced on all four sides of the unit and the base of the unit is 10 12 mm into the base of t...

Page 6: ...therwise it may cause water to leak Calibrate the levelness of the IDU using a spirit level or polyethylene tube filled with water The IDU is equipped with a built in drain pump and float switch Do no...

Page 7: ...ook Drainage pan hook Hook screw Phillips screwdriver Swing motor Foam at panel side Unit Ceiling Panel Panel bubble 1 Air outlet Air deflector Panel bubble 2 4 6 mm The plastic cover plate protruding...

Page 8: ...outdoor unit and the indoor unit may not exceed the allowable piping length In the case that the installation place is exposed to strong wind such as a seaside make sure the fan operating properly by...

Page 9: ...from becoming loose When the outlet of the water discharge pipe is higher than the pipe connection for water suction try to keep the water discharge pipe as vertical as possible and the water outlet c...

Page 10: ...nical surface of the connecting nut the refrigerant oil used must be compatible with the refrigerant of this model and screw it 3 to 4 turns with your hand to tighten it as shown in the Fig 3 9 When c...

Page 11: ...ge Refer to the following table to determine the tightening torque 1 Bend the pipe or drill a hole in the wall as needed The cross sectional area of the pipe bending deformation must not exceed 1 3 of...

Page 12: ...e or valve No power cable is attached to this equipment The user can select the power cable by reference to the stipulated power supply specifications No joint of wires is allowed Upon completion of w...

Page 13: ...ng issues before trial operation and the box for the confirmed items Perform the trial run only after the outdoor unit has been powered on for over 12 hours Check that all valves are opened before tri...

Page 14: ......

Reviews: