
57
OETIKER EPC 01
PC-sofTWaRe
Issue 11.22
08905306
Element
Description of the setting
On CU power on
select whether the pincer test is performed each time the Control Unit is started.
Mandatory pincer test
function selection «PT» and «aPn»
Directly to active aPn
Pincer test warning
select whether a warning appears after a defined number of closures.
Pincer test invitation
select whether a pincer test is performed after a defined number of closures.
OK signal at pincer
test start
select whether oK signals are sent at the start of the pincer test.
OK signal after each Pin-
cer test step
select whether oK signals are sent after each step during the pincer test.
Pincer test with authori-
zation
select whether to authorize a pincer test in the pincer test menu at the Control Unit
(
).
Two-stage guided force
test
enables the two-stage guided force test (
).
Edit compatibility mode settings
navigation:
Home > Local data set > Settings Control Unit > Compatibility mode
on the
Compatibility mode
sub-menu page the same process times of the oeTIKeR elK 02 can be readjusted
for force priority and gap priority closures.
This function is selected only in the event that an elK 02 is replaced or after consultation with oeTIKeR. The qual-
ity of the closures is maintained and there are no disadvantages.
Fig 44:
Compatibility mode sub-menu