
Clamp pincer CP 10 / CP 20 / CC 20
7 Description of PC software
Issue 06.19
08902961
7-45
7.4
Calibration menu
Fig. 34: Calibration menu
Calibration of clamp pincer CP 10 / CP 20 / CC 20 is activated in the Calibration menu.
If the device is modified (for instance by attaching a new pincer head
– even if the article number is the same) or
if a new target value for the closure force is input, the pincer must be checked.
NOTE
Possible damage to the clamp pincer and faulty clamp closures!
To ensure uniform and reproducible quality of the workflow, the pincer calibration must be executed at least
once per shift or once per day. Calibration is also necessary if any pincer components are exchanged.
OETIKER recommends checking the closure force after calibration as an additional verification measure. It is
critical to ensure that clamps are not closed in calibration mode.
Calibration is performed in partial processes Initial calibration and Closure force calibration (see also chapter
5.1.3, p. 5-22).
Initial calibration
Initial calibration is performed at a low initial closure force, so that if the target values deviate grossly from
suitable values there is no risk of damage to the pincer elements or of injury to the user.
Only one measured closure is performed during the course of the initial calibration.