96
Océ CPS700 Configuration and maintenance manual
How to open the Central Process Group
1
Under the Central Process Group is a support bar. A spring locks the support
bar. Turn the support bar anticlockwise to release the spring.
2
Slide the support bar completely out of the frame.
3
Turn the support bar clockwise until the flat surface of the support is on the
floor.
Summary of Contents for CPS700
Page 1: ...Oc CPS700 Configuration and maintenance manual...
Page 5: ...5 Oc CPS700 Configuration and maintenance manual Chapter 1 Introduction...
Page 10: ...10 Oc CPS700 Configuration and maintenance manual...
Page 11: ...11 Oc CPS700 Configuration and maintenance manual Chapter 2 The system configuration...
Page 23: ...23 Oc CPS700 Configuration and maintenance manual Chapter 3 The system maintenance...
Page 87: ...The system maintenance 87 3 Make sure that the clean unit is lifted until the mechanical stop...
Page 118: ...118 Oc CPS700 Configuration and maintenance manual...
Page 119: ...119 Oc CPS700 Configuration and maintenance manual Appendix A Safety information...
Page 123: ...123 Oc CPS700 Configuration and maintenance manual Appendix B Miscellaneous...
Page 130: ...130 Oc CPS700 Configuration and maintenance manual...