Edition 02 to 12/2013
2.6
SERVICE MANUAL
2.1.4
OPTIONAL DIRECT GROUNDS
DISCHARGE
All machines are equipped with direct hole for
coffee grounds discharge. Optional is the drawer
with a funnel going to a conveyor that expels the
grounds directly into the rubbish. Fit the con-
veyor funnel into the drawer.
The service engineer needs to:
1
Fit the conveyor funnel into the drawer.
2
Prepare the grounds discharge pipe with a
special clamp and insert it into the stainless
steel pipe under the machine.
3
Tighten the clamp to make sure it is firmly
place.
2.1.5
SWITCHING ON
WARNING
After plugged-in the machine, wait 30 sec-
onds before switch-on the machine.
NOTE: in case the following procedure shouldn’t
take effect, see the chapter on “Problems
and Solutions”.
After the preliminary operations:
Press the ON/OFF
key.
The machine will carry out a group positioning
cycle; this is the cycle for filling the boiler with water
at the end of which, if the machine is cold, there
will be a heating cycle and the display will show:
“PLEASE WAIT HEATING“
After the heating phase, the display will show:
“SELECT PRODUCT“
And the machine will be ready for use.
The heating stage takes approx, 8 minutes.
PLEASE WAIT
HEATING
SELECT
PRODUCT
1
Fig. 14
A
2
3
Fig. 15
Summary of Contents for TALENTO
Page 1: ...SERVICE MANUAL ...
Page 2: ...Edition Date Changes on last versions 02 12 2013 Inserimento specifiche Talento Special ...
Page 6: ...Edition 02 to 12 2013 IV SERVICE MANUAL ...
Page 67: ...Edition 02 to 12 2013 6 5 SERVICE MANUAL Fig 10 ...
Page 69: ...Edition 02 to 12 2013 6 7 SERVICE MANUAL Fig 15 ...
Page 108: ...Edition 02 to 12 2013 10 8 SERVICE MANUAL ...
Page 111: ...Edition 02 to 12 2013 11 3 SERVICE MANUAL ...
Page 124: ...Edition 02 to 12 2013 11 16 SERVICE MANUAL ...
Page 135: ...Edition 02 to 12 2013 13 5 SERVICE MANUAL 13 3 FLOWCHART Fig 1 ...
Page 136: ...Edition 02 to 12 2013 13 6 SERVICE MANUAL Fig 2 ...
Page 137: ...Edition 02 to 12 2013 13 7 SERVICE MANUAL Fig 3 ...
Page 138: ...Edition 02 to 12 2013 13 8 SERVICE MANUAL Fig 4 ...
Page 139: ...Edition 02 to 12 2013 13 9 SERVICE MANUAL Fig 5 ...
Page 140: ...Edition 02 to 12 2013 13 10 SERVICE MANUAL Fig 6 ...
Page 141: ...Edition 02 to 12 2013 13 11 SERVICE MANUAL Fig 7 ...
Page 142: ...Edition 02 to 12 2013 13 12 SERVICE MANUAL Fig 8 ...
Page 143: ...Edition 02 to 12 2013 13 13 SERVICE MANUAL Fig 9 ...
Page 144: ...Edition 02 to 12 2013 13 14 SERVICE MANUAL Fig 10 ...
Page 145: ...Edition 02 to 12 2013 13 15 SERVICE MANUAL Fig 11 ...
Page 146: ...Edition 02 to 12 2013 13 16 SERVICE MANUAL Fig 12 ...
Page 156: ...Edition 02 to 12 2013 14 10 SERVICE MANUAL ...
Page 157: ...Edition 02 to 12 2013 15 1 SERVICE MANUAL Fig 1 15 BEVERAGE PREPARATION Fig 2 ...
Page 163: ...Edition 02 to 12 2013 16 3 SERVICE MANUAL Fig 3 16 3 Hydraulic schematic Talento Plus ...
Page 164: ...Edition 02 to 12 2013 16 4 SERVICE MANUAL Fig 4 16 4 Hydraulic schematic Talento special ...
Page 180: ...Edition 02 to 12 2013 17 16 SERVICE MANUAL 17 2 Fridge ...
Page 181: ...Edition 02 to 12 2013 17 17 SERVICE MANUAL ...
Page 182: ...Edition 02 to 12 2013 17 18 SERVICE MANUAL 17 3 CUP WARMER ...
Page 183: ...Edition 02 to 12 2013 17 19 SERVICE MANUAL ...
Page 184: ...Edition 02 to 12 2013 17 20 SERVICE MANUAL ...
Page 196: ...Edition 02 to 12 2013 18 12 SERVICE MANUAL ...
Page 197: ...Edition 02 to 12 2013 19 1 SERVICE MANUAL 19 UPDATES ...
Page 198: ...Edition 02 to 12 2013 19 2 SERVICE MANUAL ...
Page 199: ......