OPERATOR & MAINTENANCE MANUAL
PAGE
‐
44
4.9
Earth
Connections
The
generator
and
electrical
components
have
their
respective
earth
wires
which
are
all
connected
to
the
main
earth
bar
in
the
control
cabinet.
Multiple
Earthed
Neutral
(MEN)
is
installed
on
this
generator.
4.10
Battery
Connections
The
battery
cables
should
be
disconnected
when
the
generator
is
required
to
be
transported
or
be
stored
for
long
periods.
Reconnect
the
battery
cables
before
running
the
machine.
Connect
the
red
cable
to
the
positive
(+)
terminal
post.
Connect
the
black
cable
to
the
negative
(
‐
)
terminal
post.
WARNING:
If
the
terminal
is
not
connected,
it
may
result
in
injury
or
death.
All
the
doors
must
be
earthed.
Main
earth
and
earth
spike
should
be
installed
and
tested
by
a
licensed
electrician
before
running
the
generator.
WARNING:
Do
not
dispose
of
the
battery
in
a
fire.
The
battery
may
explode.
Battery
electrolyte
solution
is
caustic
and
can
cause
severe
burns
and
blindness.
If
electrolyte
contacts
skin
or
eyes,
immediately
flush
the
area
with
water
and
urgently
seek
medical
attention.
Summary of Contents for S10KS
Page 1: ...PROMAC LEADING THE WAY OPERATOR MAINTENANCE MANUAL...
Page 2: ...S10KS GENERATING SET OPERATOR MAINTENANCE MANUAL Edition A A Date 5 May 2011...
Page 16: ...OPERATOR MAINTENANCE MANUAL PAGE 12 3 3 Generator Layout and Major Components...
Page 18: ...OPERATOR MAINTENANCE MANUAL PAGE 14 3 4 Control Cabinet and Panel 3 4 1 Control Cabinet...
Page 20: ...OPERATOR MAINTENANCE MANUAL PAGE 16 3 4 2 Control Panel...
Page 28: ...OPERATOR MAINTENANCE MANUAL PAGE 24 Alarms...
Page 29: ...OPERATOR MAINTENANCE MANUAL PAGE 25 Browsing ECU Alarms...
Page 30: ...OPERATOR MAINTENANCE MANUAL PAGE 26...
Page 31: ...OPERATOR MAINTENANCE MANUAL PAGE 27...
Page 32: ...OPERATOR MAINTENANCE MANUAL PAGE 28 3 4 5 Field Wiring Cabinet...
Page 35: ...OPERATOR MAINTENANCE MANUAL PAGE 31 3 5 Generator Wiring Diagram...