OPERATOR & MAINTENANCE MANUAL
PAGE
‐
18
1.
Control
Cabinet
Lamp
Switch
The
Control
Cabinet
Lamp
Switch
(1)
is
used
to
illuminate
the
control
cabinet
lamp
(2)
.
2.
Control
Cabinet
Lamp.
The
Control
Cabinet
Lamp
(2)
is
located
above
the
controller.
3.
RCD
Status
Lamp
The
RCD
Status
Lamp
(3)
indicates
the
status
of
the
RCD.
When
the
RCD
Status
Lamp
is
illuminated
the
earth
leakage
relay
(ELR)
is
protecting
the
outlets
and
main
field
wiring
terminals.
If
the
RCD
Status
Lamp
is
not
illuminated
the
ELR
relay
is
bypassed.
4.
RCD
Status
Lamp
Globe
Test
Button
The
RCD
Status
Lamp
Globe
Test
Button
(4)
is
used
to
test
the
function
of
the
globe
of
the
RCD
status
lamp
(3)
.
5.
Main/ATS
Battery
Charging
Indicator
Lamp
The
indicator
(5)
will
illuminate
when
the
12V
main
battery
is
being
charged
by
either
the
mains
inlet
power
or
ATS
power.
7.
Mains/ATS
Battery
Charger
Selector
Switch
The
switch
(7)
is
used
to
select
the
source
of
the
battery
charging
power,
either
Mains
Inlet
or
ATS.
8.
Audible
Alarm
IF
the
AMF
controller
senses
a
fault
.
The
Audible
Alarm
(8)
will
sound.
9.
Master
Control
Switch
The
switch
(9)
energises
the
control
panel.
Summary of Contents for S10KS
Page 1: ...PROMAC LEADING THE WAY OPERATOR MAINTENANCE MANUAL...
Page 2: ...S10KS GENERATING SET OPERATOR MAINTENANCE MANUAL Edition A A Date 5 May 2011...
Page 16: ...OPERATOR MAINTENANCE MANUAL PAGE 12 3 3 Generator Layout and Major Components...
Page 18: ...OPERATOR MAINTENANCE MANUAL PAGE 14 3 4 Control Cabinet and Panel 3 4 1 Control Cabinet...
Page 20: ...OPERATOR MAINTENANCE MANUAL PAGE 16 3 4 2 Control Panel...
Page 28: ...OPERATOR MAINTENANCE MANUAL PAGE 24 Alarms...
Page 29: ...OPERATOR MAINTENANCE MANUAL PAGE 25 Browsing ECU Alarms...
Page 30: ...OPERATOR MAINTENANCE MANUAL PAGE 26...
Page 31: ...OPERATOR MAINTENANCE MANUAL PAGE 27...
Page 32: ...OPERATOR MAINTENANCE MANUAL PAGE 28 3 4 5 Field Wiring Cabinet...
Page 35: ...OPERATOR MAINTENANCE MANUAL PAGE 31 3 5 Generator Wiring Diagram...