OPERATOR & MAINTENANCE MANUAL
PAGE
‐
43
4.8
Load
Connections
4.8.1
Sizing
Load
Cables
Selecting
the
load
cables,
number
of
cores
and
diameter,
based
on
its
allowable
amperage
and
the
distance
between
the
generator
and
the
load
is
critical.
Correct
selection
should
be
carefully
calculated.
It
is
recommended
that
there
is
a
maximum
5%
marginal
drop
only
for
the
rated
voltage
between
the
load
and
generator
via
the
cables.
This
should
be
considered
when
selecting
the
cable.
DANGER
:
If
the
load
exceeds
the
allowable
amperage
overheating
may
cause
damage
to
cables.
If
the
cables
are
too
long,
there
will
be
excessive
voltage
drop.
It
may
result
in
fire,
personal
injury,
reduced
performance
or
damage
to
machinery.
4.8.2
Connecting
Load
Cable
The
generator
is
ready
for
field
connections.
The
cables
should
be
connected
to
the
Main
wiring
terminals
which
are
located
inside
the
field
wiring
cabinet.
WARNING:
Before
connection,
the
following
precautionary
measures
must
be
taken
Connection
must
only
be
carried
out
by
a
licensed
electrician.
Battery
must
be
disconnected.
The
control
power
switch
must
be
set
to
the
“OFF”
position.
Summary of Contents for S10KS
Page 1: ...PROMAC LEADING THE WAY OPERATOR MAINTENANCE MANUAL...
Page 2: ...S10KS GENERATING SET OPERATOR MAINTENANCE MANUAL Edition A A Date 5 May 2011...
Page 16: ...OPERATOR MAINTENANCE MANUAL PAGE 12 3 3 Generator Layout and Major Components...
Page 18: ...OPERATOR MAINTENANCE MANUAL PAGE 14 3 4 Control Cabinet and Panel 3 4 1 Control Cabinet...
Page 20: ...OPERATOR MAINTENANCE MANUAL PAGE 16 3 4 2 Control Panel...
Page 28: ...OPERATOR MAINTENANCE MANUAL PAGE 24 Alarms...
Page 29: ...OPERATOR MAINTENANCE MANUAL PAGE 25 Browsing ECU Alarms...
Page 30: ...OPERATOR MAINTENANCE MANUAL PAGE 26...
Page 31: ...OPERATOR MAINTENANCE MANUAL PAGE 27...
Page 32: ...OPERATOR MAINTENANCE MANUAL PAGE 28 3 4 5 Field Wiring Cabinet...
Page 35: ...OPERATOR MAINTENANCE MANUAL PAGE 31 3 5 Generator Wiring Diagram...