OM0302
Rev 2/December 2020
Page 68 of 107
7.10 Main Control Board Description & Replacement
To access the main control board for fuse or board replacement, remove screws at each upper side of the control center
and allow the control center to rotate down, resting on the safety straps. Now the main control board is exposed for
service.
7.10.1 Main Control Board Replacement
The main control board consists of two interconnected Printed Circuit Board (PCB) assemblies. The front PCB
contains the LCD display. The back PCB contains the power supply, configuration switch, sensor inputs/outputs
and control inputs/outputs components. The mechanical and electrical interconnects for the two PCB's all occur
within the assemblies and are fastened together with standoffs and screws.
7.10.2 Main Control Board Fuse Replacement
Disconnect electrical power from cabinet before fuse replacement.
All AC circuits are fuse protected and when replacement is necessary,
USE ONLY FUSES OF SAME TYPE AND RATING FOR
PROTECTION AGAINST RISK OF FIRE
.
DESCRIPTION:
BLOWER FUSE
OUTLET FUSE
ACCESSORY
OUTPUT FUSE
LIGHT FUSE
FUSE TYPE:
TIME-LAG
TIME-LAG
TIME-LAG
TIME-LAG
FUSE SIZE:
1/4 X 1-1/4 INCH
5 X 20MM
5 X 20MM
5 X 20MM
NU-581-400
15 AMPS
3 AMPS (2)
2 AMPS
1 AMP
NU-581-500
15 AMPS
3 AMPS (2)
2 AMPS
1 AMP
NU-581-600
15 AMPS
3 AMPS (2)
2 AMPS
1 AMP
7.10.3 Main Control Board Replacement
Note: All setup and calibration data will be lost,
the memory reinitialized to the default values and all control
functions reset to an initial cabinet power condition. If possible, before the main control board replacement, it
would be preferred to know the operational parameters of the cabinet, (i.e. motor/blower voltage, setpoints, and
airflow data from previous certification.
Disconnect electrical power from the cabinet before attempting any
maintenance action.
The main control board is fastened to the control center with (6) 6-32 screws. All electrical connections are made
with removable terminals and/or Fasten connectors except for the motor/blower connector which uses a screw
terminal. Remove all electrical connections and fasteners then remove the main control board from the control
center.
Install new main control board by reattaching all electrical connections and fasteners. Once installed, rotate
control center to normal position and fasten in place.
Now reconnect power to cabinet. Upon BSCC system power up, a system master reset must be performed to clear
the microprocessors non-volatile memory to assure proper system function.
CAUTION
!
CAUTION
!
Summary of Contents for LabGard NU-581-400
Page 7: ...OM0302 Rev 2 December 2020 Page 7 of 107...
Page 9: ...OM0302 Rev 2 December 2020 Page 9 of 107...
Page 10: ...OM0302 Rev 2 December 2020 Page 10 of 107...
Page 11: ...OM0302 Rev 2 December 2020 Page 11 of 107...
Page 29: ...OM0302 Rev 2 December 2020 Page 29 of 107 Set New Password Retype new password...
Page 42: ...OM0302 Rev 2 December 2020 Page 42 of 107...
Page 100: ...OM0302 Rev 2 December 2020 Page 100 of 107...
Page 101: ...OM0302 Rev 2 December 2020 Page 101 of 107...
Page 102: ...OM0302 Rev 2 December 2020 Page 102 of 107...
Page 103: ...OM0302 Rev 2 December 2020 Page 103 of 107...
Page 104: ...OM0302 Rev 2 December 2020 Page 104 of 107...
Page 105: ...OM0302 Rev 2 December 2020 Page 105 of 107...