Section 6
Installation
Cocoon Aqua IR Hydration Pro System
16
6.5 Installing Side Panels
2
Tools/Supplies required: Phillips Head screwdriver, flat head screwdriver, 2 people
Installation (install the
left
side panel first):
a.
Start by positioning the bottom of the left side panel slightly under the
machine.
b.
Position the top of the panel as close to the final position as possible.
c.
While another person slightly lifts the machine, push down gently along the
top of the panel in order for the lip of the side panel to go behind the lip of
the bed base.
See photo below.
d.
At the head of the unit, be sure that the lip of the side panel fits in between
the lip of the bed base and the metal rectangular guide.
See photo below.