When moving the excavator, the laser receiver has to be taken to the laser beam again (Figure 42)
before continuing the work.
Digging can then be continued and the depth is measured compared to the original reference level,
even though the altitude of the excavator might have changed (Figure 43).
Xsite EASY | User manual | Page 38 of 52
Figure 43. Work can be continued after moving the machine
Figure 42. Moving the laser receiver to the beam after moving the excavator
Figure 41. Using laser reference when the jobsite height is the absolute height of the laser beam
(“30.00” in this example)
Figure 40. Using laser reference when the jobsite height is "0,00"