Maintenance Instructions
69
4. Maintenance Instructions
4.1 Technical Maintenance Procedures
Technical maintenance includes a series of procedures, such as regularly cleaning, checking, lubricating, tightening,
and adjusting every part of the tractor and replacing parts when necessary. Regular maintenance can reduce wear on
the tractor components, prevent breakdowns, extend the tractor’s work life and keep the tractor in good working order.
The technical maintenance schedule for the NorTrac 82XTC Series tractor is based on the accumulated work hours,
which includes maintenance for every shift (every 10 work hours), every 50 work hours, every 250 work hours, every
500 work hours, every 1000 work hours, every 1600 work hours, and maintenance in winter and for
long-term storage.
IMPORTANT ISSUES:
1.
All maintenance should be carried out by the owner/operator or a trained service professional who is familiar
with the tractor.
2.
In order to make the tractor work properly and to prolong its service life, technical maintenance procedures must
be strictly observed during running-in and normal operation.
3.
The tractor warranty can be voided at any time should damage happen as the result of any operator who is
unfamiliar with the tractor or when specified maintenance procedures are not performed according to
manufacturer specified timelines.
4.
Opening the engine and hydraulic system safety valve, the relief valve, and the voltage regulator are prohibited,
without prior manufacturer authorization. Making adjustments to these sensitive areas may cause damage to the
tractor, and invalidate the warranty.
Summary of Contents for 82XTC
Page 53: ...Electrical Schematic 47...
Page 117: ...TD80 Serials TD824 1F461D19K...