34
DC power supply installation
DC power supply installation navigation
•
“Verify the DC power supply shipping accessories” (page 34)
•
“Determining the minimum number of DC power supplies” (page 35)
•
“Preparing cables for installation” (page 36)
•
“Removing the bottom bezel 312096-A of the 8010co chassis” (page
38)
•
“Removing the power filler panel” (page 40)
•
“Installing the DC power supply” (page 42)
•
“Replacing the 8010co chassis bottom bezel model 312096-A” (page
50)
•
“Replacing the 8010co chassis bottom bezel model 321325-A” (page
52)
Verify the DC power supply shipping accessories
The Ethernet Routing Switch 8600 chassis ships with no installed power
supplies. Install the first power supply in the leftmost bay. Power supply
bays are numbered 1, 2, and 3 from left to right as viewed from the front of
the chassis for the 8006, 8010, and 8010co. For instructions to install the
power supply, see
“Installing the DC power supply” (page 42)
In addition to the DC power supply and the installation guide, your DC
power supply shipment contains several hardware accessories. Verify that
the items in the shipping container match those on the shipment packing
list.
Use
Table 2 "DC power supply shipping accessories: 8004DC" (page
as a checklist to verify the contents of the 8004DC shipping container.
Table 2
DC power supply shipping accessories: 8004DC
Check
Accessory
Purpose
2 two-hole crimp
lug terminals with
attached tubing
(8004)
Connect the
positive and
negative power
inputs.
1 one-hole crimp
lug terminal with
attached tubing
Connect the ground
stud.
Nortel Ethernet Routing Switch 8600
Installation — DC Power Supply
NN46205-307
02.02
19 December 2008
Copyright © 2008 Nortel Networks
.
Summary of Contents for 8004DC
Page 69: ......