23
.
Introduction
This guide provides information about the Ethernet Routing Switch 8600
8004DC and the 8005DC power supplies.
The guide also includes instructions for adding and replacing these DC
power supplies in the following Ethernet Routing Switch 8600 chassis
models:
•
8006 Chassis
•
8010 Chassis
•
8010co Chassis
DANGER
Risk of injury by electric shock
Before working on this equipment, be aware of proper safety
practices and the hazards involved with electrical circuits. Use
only power cords that have a grounding path. Ensure the switch
is properly grounded before powering on the unit.
For the minimum Ethernet Routing Switch 8600 software version required
to support the hardware, see Nortel Ethernet Routing Switch 8600
Administration (NN46205-600) .
Task and estimated time
The following table lists the estimated time to install a DC power supply in
the Ethernet Routing Switch 8600 chassis.
The estimated installation time can range from 15 to 50 minutes. The
installation time depends on the chassis model and the number of power
supplies you are installing.
Task
Estimated Time
Preparing cable for installation
5 minutes for each power supply
Removing the power filler panel
1 minute for each power supply
Installing the DC power supply
2 minutes for each power supply
Nortel Ethernet Routing Switch 8600
Installation — DC Power Supply
NN46205-307
02.02
19 December 2008
Copyright © 2008 Nortel Networks
.
Summary of Contents for 8004DC
Page 69: ......