Introduction | 2
Receiving and Unpacking
1
Check packing slip to ensure ALL material has been delivered.
2
All material shortages are to be reported to NORTEC within 48 hours from receipt of goods.
NORTEC assumes no responsibility for any material shortages beyond this period.
3
Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4
After unpacking, inspect equipment for damage. If damage is found, notify the shipper
promptly.
5
All NORTEC products are shipped on a Free-On-Board (FOB) factory basis. Any and all
damage, breakage or loss claims are to be made directly to the shipping company.
Before Installation
1
Ensure that available voltage and phase corresponds with humidifier voltage and phase as
indicated on humidifier specification label.
2
Ensure that the dedicated external fuse disconnect is of sufficient size to handle the rated
amps as indicated on the specification label. Refer to local codes.
3
Report any discrepancy immediately to the site engineer.
4
Ensure sufficient clearances will be available as described on pages 10 and 11.
5
Ensure steam lines can be routed to distributor or blower pack as described on pages 14-19
and 31.
Figure 1: Specification Label Location
Summary of Contents for NHRS 010-090
Page 6: ...3 Introduction Humidifier Components Figure 2 NHRS Humidifier Components ...
Page 28: ...25 Installation Figure 17 Duct Sensor Wiring ...
Page 30: ...27 Installation Figure 20 Digital Wall Humidistat Remote Wall Sensor ...
Page 31: ...Installation 28 Transducer Control Wiring Figure 21 Transducers Figure 22 Digital Transducers ...
Page 58: ...55 Troubleshooting Wiring Diagrams Figure 34 Wiring Diagram NHRS 010 to 090 ...
Page 59: ...Troubleshooting 56 Figure 35 Wiring Diagram NHRS 135 to 180 ...
Page 65: ...Spare Parts 62 NHRS Plumbing Parts Figure 36 Exploded view NHRS plumbing parts ...
Page 67: ...Spare Parts 64 NHRS Electrical Parts Figure 37 Exploded view NHRS electrical parts ...