16
4.5
R
OLL
S
ENSOR
I
NSTALLATION
For this installation, the roll sensor
is only being used for temperature
compensation.
1.
Mount the roll sensor to the provided roll
sensor bracket.
Figure 15 – Mounting the Roll Sensor to
the Roll Sensor Mounting Bracket
2.
Attach the roll sensor and roll sensor bracket
to the boom, near the NORAC valve block
using the provided cable ties.
3.
Attach the temperature probe on the roll
sensor to the side of the NORAC valve
block, using the provided 3/8” bolt.
Figure 16 – UC4+ Valve Block with
Temperature Probe Installed
Summary of Contents for UC4+
Page 12: ...9 Figure 3 Hydraulic Plumbing Schematic ...
Page 30: ...27 Figure 36 Load Sense Plumbing on some JD4710 Rear of Sprayer Front view of block H06 F03 ...
Page 32: ...29 Figure 38 2003 Load Sense Line Connection H06 F03 ...
Page 41: ...38 5 3 ITEM C3 44656D CABLE VALVE VARIABLE RATE DT ...
Page 42: ...39 5 4 ITEM C4 44651 VALVE EXTENSION CABLE 5 5 ITEM C10 44650 14 POWER CABLE ...
Page 43: ...40 5 6 ITEM C12 44658 01 UC4 JD JUNCTION CABLE ...
Page 44: ...41 5 7 ITEM C70 44658 08D UC4 ROLL BIAS VALVE CABLE DT ...
Page 45: ...42 5 8 ITEM C71 44647 CABLE UC3 SENSOR ROLL BIAS ...
Page 47: ...44 Figure 51 Cable C12 44658 01 BEFORE Modification ...
Page 48: ...45 Figure 52 Cable C12 44658 01 AFTER Modification ...