35
4.9
C
OMPLETING THE
I
NSTALLATION
1.
Start up your sprayer and test the sprayer’s
functionality. The NORAC Control Panel
does not need to be powered up for the
original switches to function. Unfold the
booms and raise/lower each boom and main
section.
Again confirm that the
cabling/hoses are agreeable to the
entire range of motion.
2.
If any functions do not work, review the
hydraulic and electrical portions of this
manual to check for proper installation. If
you still have trouble, contact NORAC for
assistance.
If the roll direction is opposite to
your preference when pressing the
switches, you may reverse the
direction by swapping the
connectors on the 3
rd
station block.
3.
Turn on the power for the UC4+ Control
Panel using the switch on the side of its
chassis.
4.
Repeat the Boom Speed Test as described in
Section
4.2
Boom Speed Test
with the
NORAC UC4+ Spray Height Control
installed. Record the results for comparison
in
Table 7
.
5.
The procedure for the installation of the
UC4+ Spray Height Control is now
complete. Begin the AUTOMATIC SYSTEM
SETUP procedure as described in the
UC4+
Spray Height Control Operator’s
Manual
(
M01
).
Summary of Contents for UC4+
Page 12: ...9 Figure 3 Hydraulic Plumbing Schematic ...
Page 30: ...27 Figure 36 Load Sense Plumbing on some JD4710 Rear of Sprayer Front view of block H06 F03 ...
Page 32: ...29 Figure 38 2003 Load Sense Line Connection H06 F03 ...
Page 41: ...38 5 3 ITEM C3 44656D CABLE VALVE VARIABLE RATE DT ...
Page 42: ...39 5 4 ITEM C4 44651 VALVE EXTENSION CABLE 5 5 ITEM C10 44650 14 POWER CABLE ...
Page 43: ...40 5 6 ITEM C12 44658 01 UC4 JD JUNCTION CABLE ...
Page 44: ...41 5 7 ITEM C70 44658 08D UC4 ROLL BIAS VALVE CABLE DT ...
Page 45: ...42 5 8 ITEM C71 44647 CABLE UC3 SENSOR ROLL BIAS ...
Page 47: ...44 Figure 51 Cable C12 44658 01 BEFORE Modification ...
Page 48: ...45 Figure 52 Cable C12 44658 01 AFTER Modification ...