TABLE OF CONTENTS
1
INTRODUCTION .................................................................................................................................................. 1
2
GENERAL SYSTEM DESCRIPTION ................................................................................................................... 2
3
PARTS LISTS .......................................................................................................................................................... 3
4
INSTALLATION PROCEDURE ......................................................................................................................... 10
4.1
E
XISTING SYSTEM CHECK
.............................................................................................................................. 10
4.2
B
OOM
S
PEED
T
EST
........................................................................................................................................ 10
4.3
W
ING
S
ENSOR
I
NSTALLATION
...................................................................................................................... 12
4.4
MAIN
LIFT
SENSOR
INSTALLATION .................................................................................................... 15
4.5
R
OLL
S
ENSOR
I
NSTALLATION
........................................................................................................................ 16
4.6
T
ARGET
I
NSTALLATION AND
A
LIGNMENT
.................................................................................................... 17
4.7
H
YDRAULIC
I
NSTALLATION
........................................................................................................................... 20
4.7.1
Roll Cylinder Installation .................................................................................................................................................................................. 20
4.7.2
Valve Mounting ................................................................................................................................................................................................. 22
4.7.3
Hydraulic Plumbing .......................................................................................................................................................................................... 24
4.8
E
LECTRICAL
I
NSTALLATION
.......................................................................................................................... 30
4.9
C
OMPLETING THE
I
NSTALLATION
................................................................................................................. 35
4.10
S
YSTEM
M
AINTENANCE
................................................................................................................................. 36
5
ELECTRICAL REFERENCE – CABLE DRAWINGS ........................................................................................ 37
5.1
I
TEM
C1:
44662B-40
–
S
ENSOR
T
RUNK
C
ABLE
............................................................................................. 37
5.2
I
TEM
C2:
44668
–
S
ENSOR
B
RANCH
C
ABLE
.................................................................................................. 37
5.3
I
TEM
C3:
44656D
–
C
ABLE
V
ALVE
V
ARIABLE
R
ATE
DT ............................................................................... 38
5.4
I
TEM
C4:
44651
–
V
ALVE
E
XTENSION
C
ABLE
............................................................................................... 39
5.5
I
TEM
C10:
44650-14
–
P
OWER
C
ABLE
.......................................................................................................... 39
5.6
I
TEM
C12:
44658-01
–
UC4
JD
J
UNCTION
C
ABLE
........................................................................................ 40
5.7
I
TEM
C70:
44658-08D
–
UC4
R
OLL
B
IAS
V
ALVE
C
ABLE
DT ....................................................................... 41
5.8
I
TEM
C71:
44647
–
C
ABLE
UC3
S
ENSOR
R
OLL
B
IAS
................................................................................... 42
6
APPENDIX A - INTERFACE CABLE MODIFICATION PROCEDURE ........................................................ 43
Summary of Contents for UC4+
Page 12: ...9 Figure 3 Hydraulic Plumbing Schematic ...
Page 30: ...27 Figure 36 Load Sense Plumbing on some JD4710 Rear of Sprayer Front view of block H06 F03 ...
Page 32: ...29 Figure 38 2003 Load Sense Line Connection H06 F03 ...
Page 41: ...38 5 3 ITEM C3 44656D CABLE VALVE VARIABLE RATE DT ...
Page 42: ...39 5 4 ITEM C4 44651 VALVE EXTENSION CABLE 5 5 ITEM C10 44650 14 POWER CABLE ...
Page 43: ...40 5 6 ITEM C12 44658 01 UC4 JD JUNCTION CABLE ...
Page 44: ...41 5 7 ITEM C70 44658 08D UC4 ROLL BIAS VALVE CABLE DT ...
Page 45: ...42 5 8 ITEM C71 44647 CABLE UC3 SENSOR ROLL BIAS ...
Page 47: ...44 Figure 51 Cable C12 44658 01 BEFORE Modification ...
Page 48: ...45 Figure 52 Cable C12 44658 01 AFTER Modification ...