4.7.2
Valve Mounting
1.
On a clean surface remove all plastic plugs
from the NORAC hydraulic Valve (
V01
).
2.
Install the 6MB-6MOR fittings (
F05
) on the
"P" and "T" ports and tighten to 18 ft-lbs.
3.
Install the 4MOR-4MB (
F06
) into the "S"
port and tighten to 11 ft-lbs.
Figure 27 – NORAC Valve Block
4.
Install two orifices (
F08
) into the "B" ports
with the notch facing outward
as shown
in
Figure 28
.
5.
Install the remaining orifices (
F08
) into the
"A" ports
with the notch facing inward
as shown in
Figure 28
.
6.
Install the 6MB-4MOR fittings (
F07
) into the
"A" and "B" ports and tighten to 18 ft-lbs.
Figure 28 – Valve Block Assembly
7.
Insert the 0.047” orifice (
F07A
) into the “B”
port of the 3
rd
station of the block with the
notch facing in (
Figure 29
).
8.
Insert the 0.042” orifice (
F07B
) into the “A”
port of the 3
rd
station of the block with the
notch facing in (
Figure 29
).
9.
Mount the 6MB-4MOR fittings (
F12
) into
the “A” and “B” ports on the NORAC 3
rd
station block.
Figure 29 - Orifice Orientation
Summary of Contents for UC4+
Page 12: ...9 Figure 3 Hydraulic Plumbing Schematic ...
Page 30: ...27 Figure 36 Load Sense Plumbing on some JD4710 Rear of Sprayer Front view of block H06 F03 ...
Page 32: ...29 Figure 38 2003 Load Sense Line Connection H06 F03 ...
Page 41: ...38 5 3 ITEM C3 44656D CABLE VALVE VARIABLE RATE DT ...
Page 42: ...39 5 4 ITEM C4 44651 VALVE EXTENSION CABLE 5 5 ITEM C10 44650 14 POWER CABLE ...
Page 43: ...40 5 6 ITEM C12 44658 01 UC4 JD JUNCTION CABLE ...
Page 44: ...41 5 7 ITEM C70 44658 08D UC4 ROLL BIAS VALVE CABLE DT ...
Page 45: ...42 5 8 ITEM C71 44647 CABLE UC3 SENSOR ROLL BIAS ...
Page 47: ...44 Figure 51 Cable C12 44658 01 BEFORE Modification ...
Page 48: ...45 Figure 52 Cable C12 44658 01 AFTER Modification ...