70
Instructions Manual
5. Operation
5.
Remove bolt (E) from protective cover;
6.
Lift the protective cover (F);
7.
Fit the inverter tool (G) to the gearbox
shaft end
8.
Using your hands, turn the inverter tool in
the direction shown in the illustration. The
feeding rollers will rotate in the opposite
direction to the working direction,
expelling (throwing out) accumulated
material into the platform. Rotate until all
material is removed.
9.
After the “unclogging”, remove the
inverter tool (G) and store it;
10.
Lower the protective cover (F);
11.
Fit the bolt, the two flat washers and the
nut (E).
F
E
G
Summary of Contents for FTN-1000 Super G2
Page 2: ......
Page 3: ...FTN 1000 Super COSECHADORA DE FORRAJE ESPAÑOL ...
Page 4: ...ESPAÑOL ...
Page 107: ...Manual de Instrucciones 107 9 Especificaciones ESPAÑOL 9 4 Tabla de medidas de llaves ...
Page 110: ...110 Manual de Instrucciones ...
Page 111: ...FTN 1000 Super FORAGE HARVESTER ENGLISH ...
Page 112: ...ENGLISH ...
Page 214: ...104 Instructions Manual 9 Specifications 9 1 Bolt torque table Torque unit N m ...
Page 215: ...Instructions Manual 105 9 Specifications ENGLISH 9 1 Gauge keys table ...
Page 218: ...108 Instructions Manual ...
Page 219: ......