Plywood should first be installed on the wall where the Battery Box will be positioned. This allows secure
anchoring of the screws which support the weight of the Battery Box.
1.
Using four supplied screws, secure the WM Support to the FM/WM Base-F and Base-R.
Four Screws
(M4 X 8)
WM Support
FM/WM Base-R
FM/WM Base-F
Figure 2-43 Assemble Battery Box Base
2.
Refer to
Figure 2-44 Wall-Mount Spacing Guide on page 2-33
for required spacing before drilling
holes for 10 mm anchor bolts (locally procured).
Mark and drill the four holes required to install the FM/WM Base.
SL2100
ISSUE 1.0
2-32
Installation