![NEC UNIVERGE SL2100 Hardware Manual Download Page 111](http://html1.mh-extra.com/html/nec/univerge-sl2100/univerge-sl2100_hardware-manual_3916628111.webp)
LED
Function
LED Status
Operation status
ST
Status
indicator.
On Red
Table 2-28 Operation of VOIPDB LED Indica-
tions on page 2-65
Table 2-28 Operation of VOIPDB LED Indications
LED
Operation status
ACT
LINK1000
LINK100
ST
Off
Off
Flash
Flash
Internal Error (Hardware Error)
Off
On
Flash
Flash
On
On
Flash
Flash
On
Off
Flash
Flash
State of half duplex transmission (Not support)
Please change HUB etc. to full duplex transmission.
Flash
Blinking one by one
The firmware is being updated.
4.2 Installing the SD Card (SDVMS/SDVML)
• Do not remove or install the CPU board with the power on.
• If Expansion Chassis are installed, turn the power on/off in the order of
Expansion 2 Chassis, Expansion 1 Chassis and then Main Chassis.
• When installing a SD card onto the CPU board the system MUST be
powered off. Never install or uninstall the SD card while the system is under
power.
1.
Turn off the system power.
2.
Remove the CPU board and insert the SD card (Label side up) into the slot until it clicks.
CPU board
SDVMS-C1/
SDVML-C1
SD slot (J12)
Figure 2-84 Installing the SD Card
3.
Reinstall the CPU board into the Chassis.
To Remove: Carefully push on the SD card until it clicks and release. Card can be removed from
the slot.
ISSUE 1.0
SL2100
Hardware Manual
2-65
Summary of Contents for UNIVERGE SL2100
Page 1: ...Hardware Manual GVT 010793 201 00 EU ISSUE 1 0 May 2017...
Page 14: ...MEMO SL2100 ISSUE 1 0 xii Hardware Manual...
Page 20: ...MEMO SL2100 ISSUE 1 0 R 6 PRODUCT LIABILITY...
Page 24: ...MEMO SL2100 ISSUE 1 0 R 4 Regulatory...
Page 164: ...MEMO SL2100 ISSUE 1 0 4 16 Maintenance...