![NEC UNIVERGE SL2100 Hardware Manual Download Page 48](http://html1.mh-extra.com/html/nec/univerge-sl2100/univerge-sl2100_hardware-manual_3916628048.webp)
• Make sure you have a building plan showing common equipment, extensions, the telecom
demarcation, and earth ground location. The installation site must meet the following site /
environmental requirements.
1.1.3 Site Requirements
Each Main or Expansion Chassis can have the optional Battery Box (IP4WW-Battery Box) connected,
before deciding on the mounting location refer to
Figure 2-8 Horizontal Arrangement of the Chassis on
INSTALLING THE EXTERNAL BACKUP BATTERY on page 2-22
.
• The system without the IP4WW-Battery Box should be wall-mounted only. The chassis can not be
mounted to the IP4WW-Battery Box. The IP4WW-Battery Box can be installed on either the floor or
wall (horizontally). Ensure enough space exists to allow the installation of additional Chassis and/or
battery box.
• A dedicated 100V-120V/220V/230V/240VAC circuit located within two meters of the Chassis is
required. A separate dedicated AC outlet is necessary for each Chassis.
1.1.4 Environmental Requirements
Meeting established environmental standards maximizes the life of the system. Make sure that the site
is not:
• In direct sunlight or in hot, cold or humid places.
• In dusty areas or in areas where sulfuric gases are produced.
• In places where shocks or vibrations are frequent or strong.
• In places where water or other fluids comes in contact with the equipment.
• In areas near high-frequency machines or electric welders.
• Near computers, telexes, microwaves, air conditioners, etc.
• Near radio antennas (including shortwave).
1.1.5 Unpacking
Table 2-1 Chassis Packing List
Items
List of Contents
QTY
IP7[ ]-4KSU-C1
4KSU-C1 Chassis
1
AC Power Cord (AC Power Cord is not attached for IP7WW-4KSU-C1 w/o C
type)
1
Screws (M4.1x25)
4
Wall-Mounting Template
1
1.2 Installing the Main Chassis (IP7[ ]-4KSU-C1)
A Chassis has one CPU/EXIFE board slot and four universal slots for legacy line/trunk board. When
the CPU-C1 board is installed in the first chassis, it is called the main chassis. Additional chassis,
called expansion chassis.
An Expansion Chassis can be added increasing system capacity. Each Chassis (Main or Expansion)
is powered by its own power supply.
For the detail of LED (RUN, ALM), refer to
Table 4-1 CPU LED Indications on page 4-15
.
SL2100
ISSUE 1.0
2-2
Installation
Summary of Contents for UNIVERGE SL2100
Page 1: ...Hardware Manual GVT 010793 201 00 EU ISSUE 1 0 May 2017...
Page 14: ...MEMO SL2100 ISSUE 1 0 xii Hardware Manual...
Page 20: ...MEMO SL2100 ISSUE 1 0 R 6 PRODUCT LIABILITY...
Page 24: ...MEMO SL2100 ISSUE 1 0 R 4 Regulatory...
Page 164: ...MEMO SL2100 ISSUE 1 0 4 16 Maintenance...