![NEC UNIVERGE SL2100 Hardware Manual Download Page 75](http://html1.mh-extra.com/html/nec/univerge-sl2100/univerge-sl2100_hardware-manual_3916628075.webp)
13. Plug the Battery Connection Cable into the Fuse unit.
Fuse unit
Battery Connection
Cable
Figure 2-37 Connecting the Battery Connection Cable
14. Align tabs a to f to holes A to F on Battery Box. Slide the Front cover and tighten the two screws.
b
a
A
B
C
D
E
F
c
d
e
f
Front cover
Two screws
(with stopper)
Figure 2-38 Installation of Front Cover
2.6 Mounting the IP4WW-Battery Box
The IP4WW-Battery Box can be installed on either the floor or wall. One Chassis can be mounted on
an IP4WW-Battery Box.
2.6.1 Floor-Mounting the IP4WW-Battery Box
Battery box can be mounted on the floor using the FM/WM Base-F, FM/WM Base-R and WM Support.
(Note: FM = Floor-Mount and WM = Wall-Mount)
ISSUE 1.0
SL2100
Hardware Manual
2-29
Summary of Contents for UNIVERGE SL2100
Page 1: ...Hardware Manual GVT 010793 201 00 EU ISSUE 1 0 May 2017...
Page 14: ...MEMO SL2100 ISSUE 1 0 xii Hardware Manual...
Page 20: ...MEMO SL2100 ISSUE 1 0 R 6 PRODUCT LIABILITY...
Page 24: ...MEMO SL2100 ISSUE 1 0 R 4 Regulatory...
Page 164: ...MEMO SL2100 ISSUE 1 0 4 16 Maintenance...