![NEC UNIVERGE SL2100 Hardware Manual Download Page 110](http://html1.mh-extra.com/html/nec/univerge-sl2100/univerge-sl2100_hardware-manual_3916628110.webp)
6.
Connect the VOIPDB-C1 to a Switching hub using a LAN Cable.
ST
100
1G
ACT
LOAD
RUN
ETHERNET
VO
IP
DB
EXP1
EXP2
ALM
to HUB
LAN Cable
< Side View >
VOIPDB-C1 board
(J6)
Figure 2-82 Connecting a LAN Cable
7.
Refer to the SL2100 Programming Manual for detailed programming instructions.
The VoIP feature requires system configuration.
4.1.4 LED Indication
LED indications for the IP7WW-VOIPDB-C1 are listed
Table 2-27 VOIPDB LED Indications on
. Each LED is listed with its associated function and operational status.
ST
100
1G
ACT
LOAD
RUN
ETHERNET
VO
IP
DB
EXP1
EXP2
ALM
< Side View >
ST
VOIPDB-C1 board
LINK100
LINK1000
ACT
Figure 2-83 Location of LEDs
Table 2-27 VOIPDB LED Indications
LED
Function
LED Status
Operation status
ACT
Link activity
or data transmission and re-
ception.
On Green
LED lights when link up is completed. LED flash
when data is transmitting or receiving.
LINK1000
1000Base-T link speed
indicator
On Yellow
Lights up when 1000Base-T link up.
LINK100
100Base-TX link speed
indicator.
On Red
Lights up when 100Base-TX link up.
SL2100
ISSUE 1.0
2-64
Installation
Summary of Contents for UNIVERGE SL2100
Page 1: ...Hardware Manual GVT 010793 201 00 EU ISSUE 1 0 May 2017...
Page 14: ...MEMO SL2100 ISSUE 1 0 xii Hardware Manual...
Page 20: ...MEMO SL2100 ISSUE 1 0 R 6 PRODUCT LIABILITY...
Page 24: ...MEMO SL2100 ISSUE 1 0 R 4 Regulatory...
Page 164: ...MEMO SL2100 ISSUE 1 0 4 16 Maintenance...