![NEC UNIVERGE SL2100 Hardware Manual Download Page 142](http://html1.mh-extra.com/html/nec/univerge-sl2100/univerge-sl2100_hardware-manual_3916628142.webp)
1.
Set the power switch to off position.
Figure 3-1 Power Switch Location
2.
Once the system has powered off, push in and hold the
LOAD
button on the CPU board.
If Expansion Chassis are installed, the Power Switch must be ON at
Expansion Chassis.
3.
Turn the power switch ON at the Main Chassis.
4.
Continue holding the
LOAD
button for approximately three seconds or until ALM LED lights (red).
ST
100
1G
ACT
LOAD
RUN
ETHERNET
VO
IP
DB
EXP1
EXP2
ALM
< Side View >
CPU board
LOAD button
ALM LED
RUN LED
Figure 3-2 ALM LED and RUN LED Location
5.
Release the
LOAD
button.
SL2100
ISSUE 1.0
3-2
System Start Up
Summary of Contents for UNIVERGE SL2100
Page 1: ...Hardware Manual GVT 010793 201 00 EU ISSUE 1 0 May 2017...
Page 14: ...MEMO SL2100 ISSUE 1 0 xii Hardware Manual...
Page 20: ...MEMO SL2100 ISSUE 1 0 R 6 PRODUCT LIABILITY...
Page 24: ...MEMO SL2100 ISSUE 1 0 R 4 Regulatory...
Page 164: ...MEMO SL2100 ISSUE 1 0 4 16 Maintenance...