Notes on Using Your Server 1-13
FOR PROPER OPERATION
Observe the following notes for successful operation of the server. Use of the server ignoring the
notes will cause malfunctions or failures of the server.
Make sure to power off the server before connecting or disconnecting cables between the
server and peripheral devices.
Verify that the access LED on the server is unlit before turning off the server or ejecting
the disc.
Use the forced shutdown feature (pressing the POWER switch for 4 seconds or longer) in
emergency state only (e.g., when an OS command does not shutdown the server, the
POWER switch does not turn off the server, or resetting does not work). Do not use this
feature in usual power-off operation.
Observe the following:
–
When you have just turned off the AC power of the server, wait at least 30 seconds
before turning it back on.
–
When you have turned on the AC power of the server, wait at least 30 seconds before
turning on the DC power.
–
When you have just turned off the DC power of the server, wait at least 30 seconds
before turning it back on.
If the server is connected to UPS, the same power-on interval is required.
Do not turn off the server until POST (Power On Self-Test) completes.
Do not connect or disconnect any hard disk drive while the server is running.
Turn off the power and unplug the power cord from the outlet before relocating the server.
Clean the server on a regular basis. (See Chapter 7 for cleaning.) Regular cleaning
proactively prevents various failures of the server.
Lightning may cause a momentary voltage drop. To prevent this problem, it is
recommended to use of an uninterruptible power supply unit.
For the disc which does not conform to the standard, the playback of such a disc with the
optical disk drive is not guaranteed.
If an additional LAN device is installed in PCI slot, it is hard to push the catch of the
connector with your finger that is connected to the LAN port. Disconnect the connector
pushing the catch with a standard screwdriver. At this time, be very careful for the
screwdriver not to damage the LAN port or other ports.
Check and adjust the system clock before the operation if any of the following conditions
is applicable.
–
After carriage of device
–
After storage of device
–
After the device is entered into the pause state under the environmental condition
enduring device operation (temperature: 10°C - 35°C, humidity: 20% - 80%)
Summary of Contents for N8100-1573F
Page 16: ...x This page is intentionally left blank...
Page 19: ...Notes on Using Your Server 1 3 3 5 inch Disk Model FRONT REAR...
Page 126: ...4 50 Configuring Your Server This page is intentionally left blank...
Page 296: ...A 2 Specifications This page is intentionally left blank...
Page 304: ...C 2 IRQ This page is intentionally left blank...
Page 333: ...Installing Windows Server 2008 D 29 4 Activate Windows The Windows activation is complete...
Page 390: ...G 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank...
Page 394: ...H 4 Product Configuration Record Table This page is intentionally left blank...