7-4
Disassembly and Reassembly
PREPARING FOR INSTALLATION AND REMOVAL
Follow the procedure below to prepare for installing or removing components.
1.
Shut down the operating system.
2.
Press the POWER switch to power off the server (the POWER lamp goes off).
3.
Remove all cables and power cords from the server.
NOTE:
You will need a Phillips screwdriver and a flat-blade screwdriver
to install or remove components in this server.
Summary of Contents for Express5800/120Rd-2
Page 1: ... S e r v i c e G u i d e EXPRESS5800 120Rd 2 ...
Page 2: ...xxx ...
Page 3: ... S e r v i c e G u i d e EXPRESS5800 120Rd 2 ...
Page 10: ......
Page 18: ...xvi Using This Guide This page is intentionally left blank ...
Page 64: ...1 46 System Overview This page is intentionally left blank ...
Page 86: ...2 22 Setting Up Your Server POWER lamp POWER switch ...
Page 90: ...2 26 Setting Up Your Server This page is intentionally left blank ...
Page 134: ...3 44 Configuring Your System This page is intentionally left blank ...
Page 244: ......
Page 334: ...A 2 Specifications This page is intentionally left blank ...
Page 336: ...B 2 Interrupt Requests This page is intentionally left blank ...
Page 346: ......
Page 350: ...D 4 Product Configuration Record Table This page is intentionally left blank ...
Page 360: ...10 Glossary This page is intentionally left blank ...
Page 361: ...xx ...
Page 362: ... 456 01582 000 ...