4-28 ESX Server Setup
Step 8: Connect and Configure Options
If there is any optional PCI board or peripheral equipment to connect to NEC Express5800/ft series,
turn off the power to NEC Express5800/ft series, and connect it according to the
“
PCI board
”
in
User
’
s Guide
and the device
’
s instruction.
Immediately after the installation completes, network configuration for a port is duplicated. When
you change the network configuration or configure the duplication setting by adding a LAN card, it
is necessary to configure the settings from VI client.
For detailed procedures, refer to the
User
’
s Guide
packaged with this guide and the
Server
Configuration Guide
of VMware Infrastructure.
To have enough time to initialize Fibre Channel disk and Fibre Channel switch and so on,
adjust [Server] - [Power On Delay Time] by setting System BIOS configuration Utility.
Summary of Contents for EXP320K
Page 11: ......
Page 38: ...1 22 Before Using This page is intentionally left blank ...
Page 80: ...4 20 ESX Server Setup 1 10 Enter LUN Hex select 00 1 11 Select Boot LUN select 01 ...
Page 108: ...5 16 Procedures after Completion of Installation This page is intentionally left blank ...
Page 112: ...6 4 Troubleshooting This page is intentionally left blank ...
Page 114: ......
Page 115: ......