4-6 ESX Server Setup
Step 3: Validate FC card
1.
Turn on the display and the peripheral equipment connected to the NEC Express5800/ft
series.
CHECK:
If the power cords are connected to a power controller like a UPS, make sure that
it is powered on.
2.
Detach the front bezel.
3.
Press the POWER switch that is located on the front side of the server. (The in-built LED
lit on this side.)
IMPORTANT:
Do not turn off the power before the "NEC" logo appears.
After a while, the "NEC" logo will appear on the screen.
While the "NEC" logo is displayed on the screen, NEC Express5800/ft series is
performing the power-on self test (POST) to check itself. For details, see the separate
volume of User
’
s Guide.
CHECK:
If the server finds errors during POST, it will interrupt POST and display the
error message. See the separate volume of User
’
s Guide.
CPU/IO module 0
Power LED
CPU/IO module 0
Status LED
CPU/IO module 1
Power LED
CPU/IO module 1
Status LED
CPU/IO module 1
CPU/IO module 1
Power switch
Front side of device
CPU/IO module 0
CPU/IO module 0
POWER switch
Summary of Contents for EXP320K
Page 11: ......
Page 38: ...1 22 Before Using This page is intentionally left blank ...
Page 80: ...4 20 ESX Server Setup 1 10 Enter LUN Hex select 00 1 11 Select Boot LUN select 01 ...
Page 108: ...5 16 Procedures after Completion of Installation This page is intentionally left blank ...
Page 112: ...6 4 Troubleshooting This page is intentionally left blank ...
Page 114: ......
Page 115: ......