CABLE TERMINATION
6-31
Installation
NWD-107460-02E
(3)
The gap of the connector body and clamp nut is confirmed.
(*) Gap: 2.2 to 2.7 mm
Note
Do not remove the connector body tightened up once. When removing, it
is reworked from procedure 1 or a cable is exchanged.
Tools
•
spanner (16 mm)
•
torque spanner (16 mm)
•
clearance gauge, measure
(*): Check Point
Submission Prohibited
NEC Internal Use Only