5-14
ODU MOUNTING
NWD-107460-02E
Installation
3
Rotate the transition hub 90 degrees until timing pin locates in timing concavity,
Tighten six screws when transition hub is located. (Tightening torque is 5.0 N·m
±10%.
)
(3)) ODU Direct Mounting Type Antenna (RFS example)
Notes
1.
The details are referred to the installation manual which is attached to
the antenna. The installation or removal of the antenna requires qualified
experienced personnel.
2.
The antenna is set to V-polarization when shipped from the factory.
Vertical Polarized Application
Horizontally Polarized Application
Transition hub
Transition hub
Timing Pin
Transition Hub
RFS SB1
1.
Unscrew the 4 screws M3 at the refined
steel ring,
2.
Hold the feed tightly at the waveguide,
3.
Rotate carefully the feed 90 degrees,
4.
Mount the feed to the refined steel ring
and lock the 4 screws M3.
1.
Loosen the 4 screws M3,
2.
Hold the feed tightly at the waveguide,
3.
Rotate the casting plate carefully the
feed 90 degrees,
4.
Lock the 4 screws M3.
RFS C-Mount
Drain plug
Drain plug
Submission Prohibited
NEC Internal Use Only