6-10
CABLE TERMINATION
NWD-107460-02E
Installation
(e)
Set the torque spanner.
Tightening only of clamp nut by torque spanner.
Tightening the connection to the torque value of 9 to 11 N·m.
Notes
1
When inserting, do not put the chip which is braided wire inside the
central conductor and the connector body.
2
Do not turn connector body, turn clamp nut attachment.
Tools
•
spanner (14 mm)
•
torque spanner (14 mm)
•
clearance gauge, measure
Holding only
14mm
9-11 N·m
14mm
Submission Prohibited
NEC Internal Use Only