ODU MOUNTING
5-31
Installation
NWD-107460-02E
3
Installation to antenna
Note
Tightening torque is 4.0 N·m ± 10%.
4
Attachment of Main ODU
Note
Tightening torque is 4.0 N·m ± 10%.
Packing (Supplied by Antenna)
Flat Washer M6 (4ea.)
Hexagon Socket
Head Cap Screw
M6 x 20 (4ea.)
Spring Washer M6 (4ea.)
Short Plate
In case of removing ODU,
attach this short plate t
the ODU port.
Attachment of Short Plate
Hybrid/Coupler
Antenna
equally and carefully by
Tighten the each screw
wrench at diagonal
position.
O-Ring
Connection part details
Top View
NEC ODU
(Main ODU)
Hexagon Socket
Head Cap Screw M6
(Supplied by NEC
O-Ring
(Packing)
"V" direction of ODU
with ODU)
O-Ring
(Packing)
Submission Prohibited
NEC Internal Use Only