
4
2
4.6.10. Manifold
Navien Part No.
Function
Check Point
PABCR180AMF_001
PABNR/NP180AMF_001
PABCC210AMF_001
PABCC210AMF_002
N/A
Failure Event
Effects
Error Code
E003, E004, E012
Diagnostic
Color /
Number of wires
1. The manifold distributes gas from the gas valve to the burner.
2. To provide proper quantity of gas to burner in each stage.
3. There are 3 zones within the manifold, to ensure efficient combustion
operation.
1. Dust deposit on the manifold.
2. Gas leakage from a failed manifold.
3. Ignition failure.
4. Imperfect combustion.
1. Visual inspection: Connection and/or breakage of wires.
2. Voltage check: Check range of voltage shown below.
1. Yellow – Yellow : On : DC 83 ~ 120 V, Off : 0 V
2. Red – Red : On : DC 83 ~ 120 V, Off : 0 V
1. The burner cannot receive proper gas flow from the manifold, which can
cause poor combustion in the combustion chamber. In this case, the
flame rod will detect an improper flame condition and the PCB board will
take safety measures.
2. Gas leakage from the manifold.
tGaGX_W
tGaGYXWVY[W
un
wn
XTz
YTz
ZTz
ȰWUXZ_IGGX
ȰWUXZ_IGGX
ȰWUXXYIGGZ
ȰWUW_^IGGX
ȰWUW_^IGGX
ȰWUW]`IGGZ
un
wn
XTz
YTz
ZTz
ȰWUXXXIGGY
ȰWUXXXIGGY
ȰWUXZIGG\
ȰWUW^\IGGY
ȰWUW^ZIGGY
ȰWUW^XIGG\
u¡¡
XGz
YGz
ZGz
mGnGz
zG}
©
Navien
Ameri
c
a
I
n
c
.
20
1
0
CH
series
servi
c
e
Manua
l
Version
1
.0
Summary of Contents for CH-180
Page 2: ......
Page 31: ...29 4 4 Wiring Diagram Navien America Inc 2010 CH series service Manual Version 1 0...
Page 143: ...Navien America Inc 2010 CH series service Manual 141 Version 1 0 9 2 Burner Disassemble G...
Page 146: ...Navien America Inc 2010 CH series service Manual 144 Version 1 0 9 3 Water Way Disassemble...
Page 152: ...Navien America Inc 2010 CH series service Manual 150 Version 1 0 Memo...
Page 153: ...Navien America Inc 2010 CH series service Manual 151 Version 1 0 Memo...
Page 154: ...Navien America Inc 2010 CH series service Manual 152 Version 1 0 Memo...
Page 155: ......