Click Mode Operating Instructions
8-7
8.7.3 Determination of N
As required by the standard, N may be determined either by counting the
clicks, or by counting the switching operations.
Select
Clicks
if N has to be calculated on the number of clicks, or select
Sw.Op. current
to determine N on the number of switching operations,
going up and down the list of the available options in terms of switched
current: 10mA; 20 mA; 50 mA; 100mA; 200mA; 500mA; 1A; 2A and 5A.
The current threshold value must be chosen in relation to the DUT declared
consumption.
The internal LISN is able to autonomously measure the mains current
drawn by the Device Under Test, when you need to count the
switching operations.
8.7.4 Factor f
The applicable standard may require a certain factor f to be used to
calculate the click rate N. For example, table A2 of the CISPR14 gives the
factor f for several products.
This factor depends on the nature of the EUT and shall be entered by the
User in the normal way.
8.7.5 Stop on Fail
The Click test may be rather long, as the observation time and EUT cycle
can take as long as 120 minutes.
In order to save time and increase productivity, the PMM ER9000 can stop
the test as soon as a fail condition is achieved.
Two options are therefore available: stop immediately as the fail condition
occurs (Right away) or anyway at the End of Step.
Please select the desired option.
8.7.6 Line
When using a PMM LISN, it’s possible to select the Line on which to
perform the test through the Setup Menu, just selecting the model and the
specific desired line.
In case a 3rd party LISN would be used, just leave “NONE” in the menu.
8.8 Click option
The click option includes all the items described in the PMM CA0010 User’s
Manual, briefly listed here:
•
CA0010 Click Analyzer from 150 kHz up to 30 MHz
•
AC/DC Converter with plug adapters;
•
Flexible black cover/accessories holding;
•
LISN Mains Cable
•
BNC-BNC coaxial cable 0,25 m length;
•
DB9 male to DB9 male cable 0,25 m length for ER9000 connection;
•
USB cable, 2m;
•
Operating manual;
•
Click Analysis and Click generation software
•
Certificate of Compliance;
•
Return for Repair Form.
For quick reference look at the following picture.
Summary of Contents for PMM ER9000
Page 46: ...3 20 Operating Instructions This page has been left blank intentionally...
Page 50: ...4 4 Applications Fig 4 2 ER9000 with external L2 16B LISN...
Page 52: ...4 6 Applications This page has been left blank intentionally...
Page 66: ...6 8 PMM 9010 RMA Rack Mount Adapter This page has been left blank intentionally...
Page 96: ...7 30 Remote control This page has been left blank intentionally...
Page 106: ...Suggerimenti Commenti Note Suggestions Comments Note...