7
W415-0771 / B / 08.10.09
THE FAN BOX:
THE BLOWER (CONVECTION FAN)
MECHANICAL AND ELECTRICAL INSTALLATION ARE COMPLETE AS PER PICTURE ON THE RIGHT.
2.3 UNPACKING
Inspect all components for any hidden damages.
1.
Main unit (main body of furnace):
Remove the plastic cover. Pull the corrugated box over the furnace. Hopper box & fan box are together
packed on a pallet.
2.
Hopper box:
Open the box from top. Remove hopper bottom side panels. Pull the hopper up (two people is
recommended) and put aside. Remove all other contents and put them aside. Make sure all items listed
above are counted for. Remove the hopper lid and put aside.
3.
Fan box:
Open the box from top. Remove return air box (hot air blower is inside already installed) and put aside.
(LABELED NCP-B).