
Preparatory steps – Vertical air intake
1.
Drain engine coolant (→ Page 196).
2.
Remove air filter (→ Page 175).
3.
Seal all openings with suitable covers.
4.
Remove charge-air pipework (1) from ex-
haust turbocharger to intercooler.
5.
Remove oil lines (2).
6.
Loosen clamp (1).
7.
Remove intake housing (3) with actuating
cylinder (2).
MS150066/02E 2013-02 | Task Description | 169
TIM-ID: 0000018629 - 005