List of Tables
– continued
JAN 2002
xi
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Table 4-8: MicroCell Expansion Kit for Units 3 to 4
Current 2m MIBs A and C – T448H
4-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-9: MicroCell Expansion Kit for Units 3 to 4
Longer 5M MIBs A and C – T448G
4-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-10: RGPS Synchronization Cable Kit – SGKN4351A
4-5
. . . . . . . . . . . .
Table 4-11: RGPS Synchronization Cable Kit – SGKN4352A
4-5
. . . . . . . . . . . . .
Table 4-12: Required Cables for Power, Earth Ground, and
Battery Connections
4-11
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-13: AC Input Cable Information
4-12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-14: DC Input Cable Information
4-12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-15: Procedure to Install Earth Ground Cable
4-13
. . . . . . . . . . . . . . . . . . . . .
Table 4-16: Procedure to Install AC Input Cable(s) (Indoor Applications)
4-13
. . . .
Table 4-17: Procedure to Install AC Installation Box
(Optional – Required for Outdoor Installations)
4-13
. . . . . . . . . . . . . . . . . . . . . . . .
Table 4-18: AC Installation Box Cabling
4-13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-19: Procedure to Install DC Input Cable(s)
4-14
. . . . . . . . . . . . . . . . . . . . . .
Table 4-20: Required Cables for Antenna Connections
4-15
. . . . . . . . . . . . . . . . . . .
Table 4-21: Pin and Signal Information for Cable C (Antenna Cable)
4-15
. . . . . . .
Table 4-22: Required Cables for Site I/O, Span Line, RGPS, and
Modem Cabling
4-18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-23: Pin/Signal Information for Site I/O Cable
4-20
. . . . . . . . . . . . . . . . . . . .
Table 4-24: Connecting the RGPS to the Site I/O Cable
4-23
. . . . . . . . . . . . . . . . . .
Table 4-25: Required Cables for RGPS Cabling for Multiple BTS Sites
4-24
. . . . .
Table 4-26: RGPS Synchronization Cable Kit – SGKN4351A
4-24
. . . . . . . . . . . .
Table 4-27: RGPS Synchronization Cable Kit – SGKN4352A
4-24
. . . . . . . . . . . .
Table 4-28: Procedure to Install RGPS Cabling for an Indoor Installation
4-25
. . . .
Table 4-29: Procedure to Install RGPS Cabling for an Outdoor Installation
4-26
. . .
Table 4-30: Twisted Pairs for RGPS Sync Cable (Cable X)
4-28
. . . . . . . . . . . . . . .
Table 4-31: Multi–BTS Cable Run List
4-29
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-32: Required Cables for Span Line Daisy Chain Cabling
4-32
. . . . . . . . . . .
Table 4-33: Cable Run List for Span Line Daisy Chain Cabling
4-32
. . . . . . . . . . . .
Table 5-1: Procedure to Attach the Surge Suppressor to the Mounting Bracket
5-6
Table 5-2: Required Cables for Power, Earth Ground, and Battery Connections
5-9
Table 5-3: AC Input Cable Information
5-9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-4: DC Input Cable Information
5-10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-5: Procedure to Install the Master Ground Cable on a
BTS Equipped with Optional Primary Surge Suppressor
5-10
. . . . . . . . . . . . . . . . .
Table 5-6: Procedure to Install the Earth Ground Cable on a
BTS Equipped with Optional Primary Surge Suppressor
5-11
. . . . . . . . . . . . . . . . .