Unpacking the Equipment and Inspecting for Damage
DRAFT
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
3-2
Objective
The objective of this procedure is to unpack the equipment and inspect it
for damage.
How System is Packed
A unit is shipped in two boxes. Box 1 contains site installation specific
components and box 2 contains the unit itself. All of the following are
shipped in box 1.
Box 1
Solar or fin covers
Universal mounting bracket
Rack mounting adapters and hardware
Pole mounting adapters and hardware
External cables (AC input, DC input and SU)
Lower pin
Site I/O junction box and cable assembly
Terminations
AC Installation Box (required for outdoor applications)
Box 2
Microcell unit
Box 3 (Optional)
Primary Surge Suppressor
Solar covers
Mounting bracket
Rack mounting adapters and hardware
Pole mounting adapters and hardware
Ground cables
The following are shipped separately:
Short duration battery (optional) (Kit T392AA)
Remote GPS receiver (optional)
Inspecting for Damage
Before installing any equipment, inspect it for damage. Report any
damage found to the Site Manager.
Only remove the equipment from the shipping containers when you are
ready to install.