Table of Contents
– continued
DRAFT
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
Pin and Signal Information for Site I/O Cabling
4-20
. . . . . . . . . . . . . . . . . .
Connecting Customer–Defined Inputs to the Site I/O Interface
4-22
. . . . . .
Connecting the RGPS Cable to the Site I/O Interface
4-23
. . . . . . . . . . . . . .
Connecting the Span Line Cable to the Site I/O Interface
4-23
. . . . . . . . . .
Connecting a Phone Line to the Site I/O Interface (Modem Support)
4-23
.
RGPS Cabling for Multiple BTS Sites
4-24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Objective
4-24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Background
4-24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Required Tools and Equipment
4-24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cable Diagrams and Description
4-25
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Procedure to Install RGPS Cabling for an Indoor Installation
4-25
. . . . . . .
Procedure to Install RGPS Cabling for an Outdoor Installation
4-26
. . . . . .
Cable Connections
4-29
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Span Line Daisy Chain Cabling
4-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Objective
4-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Background
4-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Required Cables
4-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Procedure
4-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cable Connections
4-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4