List of Tables
– continued
DRAFT
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
xii
Table 5-7: Procedure to Install the AC Input Cable(s) on a
BTS Equipped with Optional Primary Surge Suppressor
5-11
. . . . . . . . . . . . . . . . .
Table 5-8: Procedure to Install the DC Input Cable(s) on a
BTS Equipped with Optional Primary Surge Suppressor
5-11
. . . . . . . . . . . . . . . . .
Table 5-9: Required Cables for Antenna Connections
5-13
. . . . . . . . . . . . . . . . . . . .
Table 5-10: Pin and Signal Information for Cables C and D (Antenna Cable)
5-13
.
Table 5-11: Procedure to Install Antenna Cabling for Sites Equipped with
Primary Surge Suppressor
5-14
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-12: Required Cables for Antenna Connections
5-17
. . . . . . . . . . . . . . . . . . .
Table 5-13: Procedure to Install Site I/O Cable Between Site I/O Junction Box
and Optional Primary Surge Suppressor
5-18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-14: Pin/Signal Information for Site I/O Cable and Punchdown Block
5-20
.
Table 5-15: Customer Alarm Wiring Positions in AC Load Center on MOVs
5-22
.
Table 5-16: Connecting the RGPS to the Site I/O Cable
5-23
. . . . . . . . . . . . . . . . . .
Table 5-17: Required Cables for Multi–BTS RGPS Cabling
5-24
. . . . . . . . . . . . . . .
Table 5-18: RGPS Synchronization Cable Kit – SGKN4351A
5-24
. . . . . . . . . . . .
Table 5-19: RGPS Synchronization Cable Kit – SGKN4352A
5-24
. . . . . . . . . . . .
Table 5-20: Procedure to Install RGPS Cabling for an Indoor Installation
5-25
. . . .
Table 5-21: Procedure to Install RGPS Cabling for an Outdoor Installation
5-26
. . .
Table 5-22: Twisted Pairs for RGPS Sync Cable (Cable X)
5-28
. . . . . . . . . . . . . . .
Table 5-23: Multi–BTS RGPS Cable Run List for Primary Surge Suppressor
5-29
.
Table 5-24: Required Cables for Span Line Daisy Chain Cabling
5-32
. . . . . . . . . . .
Table 5-25: Cable Run List for Span Line Daisy Chain Cabling
5-33
. . . . . . . . . . . .
Table 6-1: Procedure to Install Back Fin Cover to Unit
6-5
. . . . . . . . . . . . . . . . . . .
Table 6-2: Installation Handle Kit
6-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-3: Procedure to Attach the Installation Handles
6-6
. . . . . . . . . . . . . . . . . .
Table 6-4: Procedure to Attach the Unit to the Mounting Bracket
6-8
. . . . . . . . . . .
Table 6-5: Required Cables for Earth Ground Cabling
6-10
. . . . . . . . . . . . . . . . . . .
Table 6-6: Procedure to Attach the Earth Ground Cables
6-10
. . . . . . . . . . . . . . . . .
Table 6-7: Procedure to Attach the Site I/O Junction Box to the Unit
6-13
. . . . . . . .
Table 6-8: Procedure to Attach a Site I/O Cap to the Unit (optional)
6-14
. . . . . . . .
Table 6-9: External Subscriber Unit Kit – T529AA
6-15
. . . . . . . . . . . . . . . . . . . . . .
Table 6-10: Terminations of Unused Connectors
6-15
. . . . . . . . . . . . . . . . . . . . . . . .
Table 6-11: Procedure to Install the SU Box
6-16
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-12: Procedure to Install the SU Cabling
6-17
. . . . . . . . . . . . . . . . . . . . . . . .
Table 6-13: Procedure to Attach the Front Fin Cover to Unit
6-18
. . . . . . . . . . . . . .
Table 6-14: Procedure to Attach the Short Duration Battery to the Unit
6-19
. . . . . .
Table 6-15: Procedure to Install Short Duration Battery Cable to Unit
6-21
. . . . . . .