Startline S 424-S 421-S 521-S 524
Operator manual
119
UK
17
- Press the pedal
(fig.16) to operate
the bead breaker and detach the bead from
the rim.
Repeat this operation on the other side of the
wheel.
It may be necessary to break the bead at several
points to free it completely.
Release the pedal to reverse the motion of the
bead breaking shoe.
After detaching the beads, remove the old
balancing weights.
- Thoroughly lubricate the sides of the tyre around the entire circumference of the lower and
upper bead to facilitate demounting and avoid damaging the beads (fig.17).
9.4. CLAMPING THE WHEEL
Keep your hands and other body parts away from moving parts of the machine while moving
the wheel locking wedges.
WARNING
If the wheel weighs more than 10 kg, with a lifting frequency of more than 20 wheels/
hour, it is recommended to use a lifting device (optional).
WARNING
Only for Startline S 521 - S 524:
- Pull the unlocking button
(position Z, Fig.18A) to position the operating arms in the
“non-working” position (tool at the top and the horizontal arm completely retracted) (A Fig. 18B).
- Press button
(position Y, Fig. 18A) to
lock the arms into the “non-working” position.
- Press pedal
(C, Fig. 18C) to take the
column into the “non-working” position (B Fig.
18B).
18A
Summary of Contents for Startline S 421
Page 64: ...64 Startline S 424 S 421 S 521 S 524 Manuale Operatore Montaggio...
Page 77: ...Startline S 424 S 421 S 521 S 524 Manuale Operatore 77 I 18 SCHEMA ELETTRICO GENERALE...
Page 78: ...78 Startline S 424 S 421 S 521 S 524 Manuale Operatore...
Page 79: ...Startline S 424 S 421 S 521 S 524 Manuale Operatore 79 I...
Page 81: ...Startline S 424 S 421 S 521 S 524 Manuale Operatore 81 I Note...
Page 144: ...144 Startline S 424 S 421 S 521 S 524 Operator manual Mounting...
Page 157: ...Startline S 424 S 421 S 521 S 524 Operator manual 157 UK 18 GENERAL WIRING DIAGRAM...
Page 158: ...158 Startline S 424 S 421 S 521 S 524 Operator manual...
Page 159: ...Startline S 424 S 421 S 521 S 524 Operator manual 159 UK...
Page 161: ...Startline S 424 S 421 S 521 S 524 Operator manual 161 UK Notes...
Page 224: ...224 Startline S 424 S 421 S 521 S 524 Manuel Op rateur Montage...
Page 237: ...Startline S 424 S 421 321 S 524 Manuel Op rateur 237 F 18 SCH MA LECTRIQUE G N RAL...
Page 238: ...238 Startline S 424 S 421 S 521 S 524 Manuel Op rateur...
Page 239: ...Startline S 424 S 421 321 S 524 Manuel Op rateur 239 F...
Page 241: ...Startline S 424 S 421 321 S 524 Manuel Op rateur 241 F Notes...
Page 304: ...304 Startline S 424 S 421 S 521 S 524 Bedienungsanleitung Montage...
Page 317: ...Startline S 424 S 421 S 521 S 524 Bedienungsanleitung 317 D 17 ALLGEMEINGER SCHALTPLAN...
Page 318: ...318 Startline S 424 S 421 S 521 S 524 Bedienungsanleitung...
Page 319: ...Startline S 424 S 421 S 521 S 524 Bedienungsanleitung 319 D...
Page 321: ...Startline S 424 S 421 S 521 S 524 Bedienungsanleitung 321 D Anmerkungen...
Page 384: ...384 Startline S 424 S 421 S 521 S 524 Manual Operador Montaje...
Page 397: ...Startline S 424 S 421 S 521 S 524 Manual Operador 397 E 18 ESQUEMA EL CTRICO GENERAL...
Page 398: ...398 Startline S 424 S 421 S 521 S 524 Manual Operador...
Page 399: ...Startline S 424 S 421 S 521 S 524 Manual Operador 399 E...
Page 401: ...Startline S 424 S 421 S 521 S 524 Manual Operador 401 E Notas...