Electrical Systems
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
5 • 1 4 4
EXECUTIVE
erator. This is done using the
UP
or
DOWN
arrows until Generator Start/Stop:
Press (on/off) is displayed. The display will inform the user of the generator’s
status. The generator will need to be manually stopped.
To enable the automatic generator operation, the programming mode must
be entered. Before any field reference points can be established, the clock must
first be set. The clock set field is the last item in the programming menu.
Clock Set:
The clock is a 24 hour clock. If the display reads 00:01, it is 12:01 a.m. If
the clock reads 13:00, it is 1:00 p.m. The hours and minutes will flash, alternat-
ing every eight seconds. Use the Settings button to advance hours or minutes.
The clock time will be erased whenever the main battery disconnects are turned
off.
Generator Start:
Selecting a state of charge (SOC) generator start point is affected by the Fuel
Gauge Cutout voltage setting. SOC start points are between 40-60 percent, or
the generator may be programmed to start at a specified voltage. The manual
start disables the automatic start.
Generator Stop:
Selecting a state of charge generator stop point is affected by the Fuel Gauge
Cutout voltage setting. SOC stop points are between 90-99 percent, or the gen-
erator may be programmed to stop at the Absorb or Float point of charge cycle.
The manual off disables the automatic stop.
Begin Generator Quiet Time or End Generator Quiet Time:
The automatic generator start feature may be programmed to operate only at
certain times in the 24 hour clock period. Example: The user wants the automat-
ic generator to start operation at 10:00 a.m. and stop operation at 7:00 p.m.
End Generator Quiet Time:
This is the time which the automatic generator operation is to begin. Using
the example above, the 24 hour clock would be set to 10.00 hrs.
Begin Generator Quiet Time:
This is the time which the automatic generator operation is set to stop. Using
the previous example as a reference, the 24 clock would be set to 19:00 hrs.
NOTE: If the generator was started from the automatic start pro-
gram and has not reached the automatic stop set point when quiet
time begins, the generator will stop. Gen Quiet Falt will be dis-
played.
Select Generator:
The inverter has the capability to operate more than one generator
Summary of Contents for Executive 2001
Page 1: ......
Page 6: ...E X E C U T I V E SECTION 1 WARRANTY INFORMATION...
Page 7: ......
Page 22: ...E X E C U T I V E SECTION 2 OPERATING SAFETY...
Page 23: ......
Page 46: ...E X E C U T I V E SECTION 3 APPLIANCES EQUIPMENT...
Page 47: ......
Page 106: ...E X E C U T I V E CHAPTER 4 WATER LP GAS SYSTEMS...
Page 107: ......
Page 129: ...Water LP Gas Systems EXECUTIVE 4 1 2 9 NOTES...
Page 130: ...E X E C U T I V E SECTION 5 ELECTRICAL SYSTEMS...
Page 131: ......
Page 177: ...Electrical Systems 5 1 7 7 EXECUTIVE N NO OT TE ES S...
Page 178: ...E X E C U T I V E SECTION 6 UNIT CARE MAINTENANCE...
Page 179: ......
Page 203: ...Unit Care Maintenance EXECUTIVE 6 2 0 3 NOTES...
Page 204: ...E X E C U T I V E SECTION 7 CHASSIS INFORMATION...
Page 205: ......