Electrical Systems
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
The inverter uses a battery temperature sensor to adjust charge voltage.
When the battery temperature rises the BTS will send this information, register-
ing as counts, to the inverter to decrease charge voltage. Voltage compensation
with temperature variation is necessary to keep charge voltage at optimum
figures. The BTS should be adhered to a house battery. If the BTS is unplugged,
the inverter default setting of 77º is used as the charge temperature reference
point.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Incorporated in the inverter is a double pole “pass-through” relay which trips
when AC power is supplied to the input terminals. This will transfer AC power
through the inverter to a sub panel supplying AC power to outlets and appli-
ances. When AC power is supplied to the inverter, the internal battery charger
will “ramp up” battery charging voltage. A 20 second time delay allows charge
stabilization before pass through AC power is supplied to the sub panel.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
This field is a general overview of system status. This is the primary screen
of the RC7 remote. This field area includes:
• Waiting for AC:
System inactive waiting
for AC power to be supplied.
• Inverting:
Unit is inverting.
• Charging Cycle Status:
Bulk, Absorb or
Float mode.
• Battery State of Charge:
Based on the Fuel
Gauge Cutout setting. It may be displayed in
percentages or as a fuel gauge.
• Time Left To Run:
This evaluates the
battery reserve capacity at current operating
load. It is based on the Fuel Gauge Cutout
and Battery Bank Capacity settings.
• Time Left To Charge:
Estimated time left to
charge batteries to full state of charge. This
is based on Fuel Gauge Cutout and Battery
Bank Capacity settings with current battery
voltage.
• Generator Start/Stop:
Use inverter
ON/OFF
button to remotely start generator or to over-
ride automatic generator start feature for
manual operation. This feature is available
for use without altering automatic generator
start programming.
5 • 1 3 9
EXECUTIVE
Battery Temperature
Sensor (BTS)
Pass-through
AC Power
Operating Display
Battery Temperature Sensor.
Summary of Contents for Executive 2001
Page 1: ......
Page 6: ...E X E C U T I V E SECTION 1 WARRANTY INFORMATION...
Page 7: ......
Page 22: ...E X E C U T I V E SECTION 2 OPERATING SAFETY...
Page 23: ......
Page 46: ...E X E C U T I V E SECTION 3 APPLIANCES EQUIPMENT...
Page 47: ......
Page 106: ...E X E C U T I V E CHAPTER 4 WATER LP GAS SYSTEMS...
Page 107: ......
Page 129: ...Water LP Gas Systems EXECUTIVE 4 1 2 9 NOTES...
Page 130: ...E X E C U T I V E SECTION 5 ELECTRICAL SYSTEMS...
Page 131: ......
Page 177: ...Electrical Systems 5 1 7 7 EXECUTIVE N NO OT TE ES S...
Page 178: ...E X E C U T I V E SECTION 6 UNIT CARE MAINTENANCE...
Page 179: ......
Page 203: ...Unit Care Maintenance EXECUTIVE 6 2 0 3 NOTES...
Page 204: ...E X E C U T I V E SECTION 7 CHASSIS INFORMATION...
Page 205: ......