![MJ Research PTC-0200 Operation Manual Download Page 27](http://html1.mh-extra.com/html/mj-research/ptc-0200/ptc-0200_operation-manual_1812923027.webp)
4-4
4-4
4-4
4-4
4-4
DNA Engine & DNA Engine Tetrad Operations Manual
Operating Alpha Units
Note:
Note:
Note:
Note:
Note:
Operation of the Twin Tower will not be discussed, owing to the
many differences between this type of Alpha unit and the others. Please
see the
Twin Tower Block Operations Manual
for operating instructions.
Note:
Note:
Note:
Note:
Note:
Alpha units equipped with Power Bonnets are installed and removed
as described below. See the
Power Bonnet User’s Manual
for instructions on
opening and closing Alpha units with Power Bonnets.
Installing an Alpha Unit
1.
Turn the DNA Engine off (see the Caution on p. 4-5)
.
2. Hold the Alpha unit at its front and back edges.
3. Lower the Alpha unit into the DNA Engine base, leaving at least 3cm
between the front edge of the Alpha unit and the front of the base.
4. Raise the handle at the back of the Alpha unit, and slide the block
forward as far as it will go (fig. 4-1A).
5. Push the handle down until it is completely vertical (fig. 4-1B); firm
pressure may be required. A definite click signals that the Alpha unit’s
connectors have mated with the DNA Engine’s connectors.
When the handle is in the down position, the Alpha unit is locked into place.
A
A
A
A
A
B
B
B
B
B
Figure 4-1
Installing an Alpha unit.
Summary of Contents for PTC-0200
Page 6: ...Part I The DNA Engine ...
Page 7: ......
Page 11: ......
Page 23: ......
Page 76: ......
Page 92: ......
Page 96: ......
Page 105: ...Part II The DNA Engine Tetrad ...
Page 106: ......
Page 117: ...Part III Accessories ...
Page 118: ......
Page 125: ...13 7 13 7 13 7 13 7 13 7 The Remote Alpha Dock System Figure 13 5 Flush mounting template ...
Page 129: ......
Page 131: ......
Page 133: ......