20
4
Operation
Installation and battery charging
n
Installation
2. Check the battery lamp.
If the battery lamp (orange) on the control unit
flashes, battery charging is required.
1. Move to a flat area.
Equipotential
terminal
Equipotential
wire
Battery lamp
3. If the battery indicator shows empty (red), battery
charging is required.
Red
CAUTION
Equipotential grounding
Ground an equipotential
terminal and medical grounding
terminals by means of an
equipotential wire.
Prepare an equipotential wire
on your side.
Summary of Contents for MOS-1302B
Page 4: ......
Page 5: ...1 1 Introduction 1 Introduction ...
Page 6: ...2 1 Introduction ...
Page 9: ...5 2 Before use 2 Before use ...
Page 18: ...14 2 Before use ...
Page 19: ...15 3 Component identification 3 Component identification ...
Page 22: ...18 3 Component identification ...
Page 48: ...44 4 Operation ...
Page 49: ...45 5 Using the leg traction device 5 Using the leg traction device ...
Page 66: ...62 5 Using the leg traction device ...
Page 67: ...63 6 Maintenance and inspection 6 Maintenance and inspection ...
Page 70: ...66 6 Maintenance and inspection ...
Page 71: ...67 7 Specifications 7 Specifications ...
Page 74: ...70 7 Specifications Appearance Operating Table Extension arm right left ...
Page 75: ...71 8 When the control unit can not be used 8 When the control unit can not be used ...
Page 77: ...73 9 Troubleshooting 9 Troubleshooting ...
Page 80: ...9 Troubleshooting 76 ...
Page 81: ...77 APP Electromagnetic compatibility App Electromagnetic compatibility ...