6
PRE-OPERATIONAL PROCEDURES AND SETTINGS
6.4 Unit Tests
6.4.2 Self-loopback test
6
- 10
1
O
VER
VIE
W
2
SYS
T
E
M
CO
NF
IG
U
R
A
T
IO
N
3
S
P
E
CIFICA
TI
ONS
4
MODB
US
(R)
S
TA
NDA
RD
FUN
C
TIO
N
S
5
FUNC
TI
ON
6
PR
E
-O
PER
A
T
ION
AL
P
R
OCED
URE
S A
ND
SE
TTINGS
7
P
A
RA
MET
E
R S
E
TTI
N
G
8
UTIL
ITY P
A
CK
AGE
(G
X Co
nf
ig
u
rat
o
r-M
B)
(4) Self-loopback test completion
(a) When completed normally
To start data communication with a target device after completing the test, perform
the following operation to start the data communication.
• Perform the intelligent function module switch settings at GX
Developer.(
• Power OFF the station and connect a communication cable to the target
device.
• Power ON the station.
(b) When completed abnormally
If an error occurs, remove the error cause by following the Table6.4, check the
following, and perform the test again.
• The QJ71MB91, power supply module and programmable controller CPU are
mounted correctly on the base unit.
• The operating environment of the QJ71MB91 meets the general
specifications of the programmable controller CPU module.(
QCPU
User's Manual (Hardware Design, Maintenance and Inspection)
• The power capacity is sufficient.
• The hardware of the programmable controller CPU and base unit is normal
according to the manual of each module.
If, after checking the above points and re-performing the test, the hardware test is
completed abnormally again, a QJ71MB91 hardware error may have occurred.
Please consult your local Mitsubishi service center or representative, explaining a
detailed description of the problem.
Summary of Contents for QJ71MB91
Page 1: ......
Page 2: ......
Page 366: ...App 14 Appendix 4 External Dimensions APPENDICES Memo ...
Page 371: ......
Page 372: ......