6
PRE-OPERATIONAL PROCEDURES AND SETTINGS
6.2 Pre-Operational Procedures and Settings
6
- 2
1
O
VER
VIE
W
2
SYS
T
E
M
CO
NF
IG
U
R
A
T
IO
N
3
S
P
E
CIFICA
TI
ONS
4
MODB
US
(R)
S
TA
NDA
RD
FUN
C
TIO
N
S
5
FUNC
TI
ON
6
PR
E
-O
PER
A
T
ION
AL
P
R
OCED
URE
S A
ND
SE
TTINGS
7
P
A
RA
MET
E
R S
E
TTI
N
G
8
UTIL
ITY P
A
CK
AGE
(G
X Co
nf
ig
u
rat
o
r-M
B)
6.2 Pre-Operational Procedures and Settings
A rough procedure for operation is shown below.
Figure 6.1 Pre-operational procedures and settings
Procedure for operation
Confirm the devices to be used and specifications.
Mount the QJ71MB91 on the base unit.
Connect GX Developer and programmable controller
CPU via a cable.
Perform the hardware test.
Perform the self-loopback test.
Set the I/O assignment with GX Developer.
Set the intelligent function module switches with GX
Developer.
Connect the MODBUS master device/MODBUS slave device
to the QJ71MB91 with a cable.
R
Confirm the function parameters to be used.
(To next page)
R
Summary of Contents for QJ71MB91
Page 1: ......
Page 2: ......
Page 366: ...App 14 Appendix 4 External Dimensions APPENDICES Memo ...
Page 371: ......
Page 372: ......